翻訳と辞書
Words near each other
・ HWA Cruiserweight Championship
・ HWA Heavyweight Championship
・ HVDC Haenam–Cheju
・ HVDC Hellsjön–Grängesberg
・ HVDC HelWin1
・ HVDC HelWin2
・ HVDC Hokkaido–Honshu
・ HVDC Inter-Island
・ HVDC Itaipu
・ HVDC Italy–Corsica–Sardinia
・ HVDC Italy–Greece
・ HVDC Kingsnorth
・ HVDC Lehrte–Misburg
・ HVDC Leyte–Luzon
・ HVDC Mechanicville–Schenectady
HVDC Moyle
・ HVDC Norway–Germany
・ HVDC Rihand–Delhi
・ HVDC Russia–Finland
・ HVDC Sileru–Barsoor
・ HVDC SylWin1
・ HVDC Thailand–Malaysia
・ HVDC Three Gorges – Changzhou
・ HVDC Three Gorges – Guangdong
・ HVDC Tian–Guang
・ HVDC Tjæreborg
・ HVDC Troll
・ HVDC Vancouver Island
・ HVDC Visby–Näs
・ HVDC Volgograd–Donbass


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

HVDC Moyle : ウィキペディア英語版
HVDC Moyle

The HVDC Moyle Interconnector is the HVDC link between Auchencrosh, South Ayrshire in Scotland and Ballycronan More, County Antrim in Northern Ireland, which went into service in 2001. It is owned and operated by Mutual Energy. Work is currently being carried out by Nexans (Norway) with the aid of Morrows (N.I) and Romac Civil Engineering (N.I) to replace the two existing cables between Scotland and Northern Ireland.
The HVDC Moyle has capacity of 500 MW. It consists of two monopolar 250 kV DC cables with a transmission capacity of 250 MW each. The converter stations are completely equipped with light triggered thyristors.〔(【引用サイトリンク】title=HVDC – High Voltage Direct Current Power Transmission )
The converter station at Auchencrosh is connected via a single-circuit 275 kV overhead three-phase AC line, which is installed on delta-type pylon with Coylton substation where the connection with the high voltage grid of Great Britain takes place. As line connection a long monopolar cable is used, of which are implemented as submarine cables.
Mutual Energy is a mutual company which manages energy assets for Northern Ireland's energy consumers.
, the interconnector was out of service, repair efforts were being made, and the cable became operational again with 450 MW in February 2012. However, further faults meant that a major part of the interconnector had to be taken out of service until it could be augmented with additional cables, whose laying Mutual Energy estimates will be completed in 2016 or 2017. Until then, the interconnector's capacity is reduced to 250 MW, half of its design capacity.
Intraday capacity trading is not available, but is being discussed.〔(【引用サイトリンク】title=Charging for interconnector capacity allocated intra-day in SEM )
==Sites==


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「HVDC Moyle」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.